Contruction
& Equipment

TRUSTED PARTNER IN RENEWABLE ENERGY CONSTRUCTION

Integrity

Precision

Commitment

copy of whatsapp image 2025 08 20 at 18.26.29
About Company

PT KOLEGA BERSATU KAWAN is a privately held national company specializing as a subcontractor and field manpower provider for Solar Power Plant (PLTS) projects. Established in 2025 and headquartered in South Jakarta, the company is committed to supporting Indonesia’s transition to clean energy by delivering professional, high-quality, and standards-compliant solar construction services.We focus on the execution phase of solar projects, including the installation and construction of solar power systems based on designs provided by our clients and partners. With reliable field manpower and as a fully licensed subcontractor, we ensure that every project we handle complies with both national and international standards.Driven by collaboration and integrity, PT KOLEGA BERSATU KAWAN is supported by experienced professionals and trusted strategic partners. We believe that solar energy is the power of the future, and we are proud to contribute to Indonesia’s energy transformation through construction services that are reliable, sustainable, and supported by competent field manpower

PURPOSE, MISSION & VALUES

services 11

We Provide Superior Roofing Services

  • Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
  • Solar Panel Installation Professional on-site installation for residential, commercial, and industrial projects.
  • Engineering & System Design Custom solar energy system design tailored to your energy needs and site conditions.
  • On-Grid & Off-Grid Systems Expertise in installing both grid-connected and stand-alone solar systems.
  • Hybrid Solar Systems Integration of solar with battery storage and backup generators for stable power.
  • Operation & Maintenance (O&M) After-installation monitoring, troubleshooting, and maintenance services.

IMPLEMENTATION PROCESS

Project Handover from Client

Receive technical design documents and work plans from the client or consultant.

Site Preparation

Clear and adjust the work area according to the solar panel layout.

Mounting Structure Installation

Install the solar panels, inverters, and other key system components as per design.

Electrical Wiring & Grid Integration

Install wiring and connect the system to the electrical grid or designated load point.

Solar Panel & Inverter Installation

Install the solar panels, inverters, and other key system components as per design.

Testing & Commissioning

Conduct final system testing, performance verification, and officially hand over the project.

PROJECT PORTFOLIO

copy of whatsapp image 2025 08 21 at 14.13.22 (1)

KTI Krenceng – 200.000 kWp

Installation and commissioning of a 200.000 kWp on-grid solar PV system at KTI Krenceng, including manpower, scaffolding, HSE supervision, accommodation, transportation, and temporary site facilities. Completed in 6 weeks with one-time maintenance and a one-year installation warranty, excluding accessories, logistics,
cable dismantling, and idle time.

copy of whatsapp image 2025 08 21 at 14.13.22

NWP Pejaten Village– 681.5 kWp

Installation and commissioning of a 681.5 kWp on-grid solar PV system for NWP, including manpower, scaffolding, HSE supervision, heavy equipment, temporary site facilities, and one-time maintenance. Completed in 6 weeks, excluding materials, delivery, inverter racking and grounding installation, and idle time.

copy of whatsapp image 2025 08 21 at 14.13.22 (1)

Kanemory Food – 637.2 kWp

Installation and commissioning of a 637.2 kWp on-grid solar PV system at Kanemory Food, Cikande, including manpower, scaffolding, HSE supervision, commissioning test, heavy equipment, accommodation, and temporary site facilities. Completed in 8 weeks with one-time maintenance, excluding materials, delivery, inverter and grounding installation, and lightning protection.

copy of whatsapp image 2025 08 21 at 14.13.22

Ethica Industri Farmasi - 756,45 kWp

Installation and commissioning of a 756.45 kWp on grid solar PV system at Ethica Industri Farmasi, including manpower, scaffolding, safety supervision, accommodation, transportation, and temporary site facilities. Completed with one-time maintenance and a one-year installation warranty

OUR CLIENT
image removebg preview (34)
image removebg preview (35)
image removebg preview (36)
image removebg preview (38)
image removebg preview (39)
image removebg preview (40)
Don't Know What To Start With?

Get A Solutions For All Roofing Services

Contact Us

Bellezza BSA 1st Floor Unit 106, Permata Hijau Kebayoran Lama Jakarta Selatan 12210 . Lihat d

Phone: +6852 6375 3675

Email: info.koberka@gmail.com

Free Consultation

Get A Free Quote